An engineer once handed us a twelve-page technical narrative for a claim. It was well written and covered every aspect of the project. It described what the company built, the machines it bought, the customers it won and how proud the team was of the result. It was an awkward moment for me, as I had to politely tell him that, as nice as it was, it wasn’t much use to me. The reason was that the text focused on what the work did for the company, not on whether it increased the existing technical baseline.
That gap is where most R&D technical narratives fail. HMRC isn’t asking whether the work was hard or impressive. It asks a narrower question: what existing technological baseline were you trying to extend, was there genuine scientific or technological uncertainty, and did your company try to resolve it?
What HMRC is actually reading for
The test comes from the government’s guidelines on what R&D means for tax purposes. In plain English, a project qualifies if it seeks an advance in science or technology by resolving uncertainty that a competent professional in the field could not readily resolve.
A strong narrative answers four questions, in this order:
- What was the baseline? What could the field actually do with the knowledge that was available to them at the time (i.e. publicly available or readily deducible)? Not what your company could do. What the field could do. This is absolutely fundamental, and HMRC will assess the whole claim on this.
- What advance were you seeking? What capability did you set out to achieve that went beyond that baseline?
- What was uncertain? What couldn’t a competent professional work out in advance, and why not?
- How did you tackle it? What did you hypothesise, test, change and learn, including what didn’t work?
The Additional Information Form (AIF) now asks for this structure directly, project by project. The narrative behind it needs to support each answer with real detail.
Five things that make a narrative stand up
1. It names the uncertainty precisely. “We didn’t know if it would work” says little. Compare: “We could not predict how the coating would behave under repeated thermal cycling between -40°C and 180°C, because published data stopped at 120°C and the failure mode at higher temperatures wasn’t documented.” That second version gives a reviewer something concrete to assess.
2. It separates the technical from the commercial. Uncertainty about whether customers would buy the product, whether it would arrive on time or whether it would come in on budget is not technological uncertainty. Many narratives mix the two, and the commercial material dilutes the technical case.
3. It explains why a competent professional couldn’t just solve it. If an experienced engineer in your sector could have looked at the problem and known the answer, it probably isn’t R&D. The narrative should explain why existing methods, products or published knowledge fell short. Name the alternatives you considered and why they didn’t work.
4. It shows the work, including the failures. HMRC reviewers expect a real development process to involve iteration. Failed prototypes, simulations that didn’t match test results, and designs you abandoned are often the strongest evidence that uncertainty existed. A narrative where everything worked the first time invites the question of whether anything was uncertain at all.
5. It draws a clear boundary. R&D starts when work begins to resolve the uncertainty. It ends when the uncertainty is resolved, or the work is abandoned. Production tooling, routine testing and commercial rollout usually fall outside. A narrative that sets out where the qualifying work starts and stops is far easier to defend than one that claims the whole project.
What weakens a narrative
There are patterns we see repeatedly when we review claims or help with enquiries:
- Generic language that could describe any company in any sector. If the narrative still reads correctly with the company’s name swapped out, it is probably too general.
- Marketing language. “Industry-leading”, “revolutionary” “bespoke” and “cutting-edge” tell a reviewer nothing about uncertainty.
- Describing the product rather than the problem. A feature list is not an R&D narrative.
- No link to the costs. The staff, materials and subcontractors in the claim should connect clearly to the projects described. If they don’t, the numbers and the story pull apart.
This isn’t about clever wording. A strong narrative is mostly a clear account of real technical work, written by someone who understood it.
How we approach it
The best narratives start with a conversation with the people who did the work. John and Jason both come from engineering backgrounds, so that conversation is technical from the first minute. We ask what the team tried, what broke, and what surprised them, and we often find the real uncertainty in a detail the team dismissed as routine.
We then write the narrative to the structure HMRC uses to read it: baseline, advance, uncertainty, resolution. Each project is tied to the costs it supports. We would rather claim less with a narrative we can defend than stretch a project to cover work that doesn’t qualify.
Many accountants who introduce clients to us handle the figures expertly and want a technical partner for the narrative. That split works well, and we’re always happy to talk through a particular client’s projects with them.
If you’d like a second opinion
If you’re preparing a claim, or you’d like to know how an existing narrative would read to HMRC, John or Jason would be glad to have an informal conversation, with no obligation: www.vantagernd.co.uk/book. Or send us a short overview of your projects, and we’ll record a personal video review with honest feedback: www.vantagernd.co.uk/review-your-project.
Correct as of November 2026. R&D tax relief rules and HMRC’s guidance change from time to time. This article is general information, not advice on your specific circumstances, so please take professional advice before acting on it.